Getting Started

Prerequisites​

  • You are a member of an AECIS project with at least Read all access to Daily Report (see Overview).
  • To fill in a report you also need Write all (your own stakeholder) or Write global (any stakeholder).
  • To change the zone scope or the send schedule you need Project Admin / License Admin access to Project Settings.

Open the module​

  1. Sign in to AECIS and open your project.
  2. In the left navigation sidebar, expand the TRACKING group.
  3. Click Daily Report.

Screen layout​

Daily Report does not use the standard three-column shell. It is a full-width table, and choosing Edit or Preview replaces the whole screen surface:

  • Roster table — one row per stakeholder, with two column bands: Latest update and Total documents. See The stakeholder roster.
  • Reports button (toolbar) — opens the sent-report archive as a side panel.
  • Edit (row action) — swaps the screen for the edit screen of that stakeholder's report.
  • Preview — swaps the screen for the full-screen preview of the compiled PDF.

Use the back control on the edit or preview surface to return to the roster.

The Daily Report roster

A typical day​

  1. Open your stakeholder's report from the roster with Edit.
  2. On the Report tab, update progress, working time, incidents, manpower, and equipment. Everything autosaves — there is no Save button.
  3. Attach the day's PDFs on the Attachments tab.
  4. File the day's photos into their zones on the Zone Photos tab.
  5. Open Preview, check the compiled report, and click Submit to stamp it complete.
  6. At the configured time, the scheduled send compiles every stakeholder's report, files the PDFs in the archive, and emails the project.
Submitting is not sending

Submit records that the report is complete. It does not produce an archived PDF and does not send any email — only the scheduled event does that. See Preview and Submit.